INSTALLATION PROCESS OF BISON WEIGH-IN-MOTION SYSTEMS

The installation of a Weight-In-Motion (WIM) system involves a comprehensive process that our team of experienced engineers meticulously oversees. Beginning with tailored solutions, detailed technical drawings, and coordinating infrastructure preparation, we ensure efficient deployment without particular machinery. Our dedicated team collaborates closely with yours, supervising on-site activities and conducting thorough system testing to guarantee accurate and smooth weight measurements. 

cutting the pavement using an asphalt cutter

excavation tracking by iWiM technicians

excavation of the holes housing the weighing plates

BISON WIM excavation in the road for bending plates

leveling of the excavation bottom for positioning of wim plates

excavation of the holes housing the BISON weighing plates and track up to the roadside for cable ducts

casting of fibre-reinforced cement mortar through the hopper

ISON WIM bending plates POSITIONING AND LEVELLING

connection of wim Datalogger positioned inside the road cabinet

WIM Datalogger inside the road cabinet

ANPR CAMERA AND LIDAR INSTALLLATION INTEGRATED WITH WIM

Installation of ANPR and lidar for integration with weigh in motion system

READY TO OPERATE

The installation of the Weigh In Motion (WIM) system is a rapid procedure carefully developed by our engineers to meet the urgent needs of our clients, particularly when the road must be operational within a short timeframe. The process takes only a few hours. Following this, the weigh-in-motion system is up and running, and our engineers proceed with remote setup and adjustments for optimal performance.

Trust us for end-to-end support in implementing a successful WIM system.